Well, the house is in. Power and water have been connected. The all-important air conditioner has been installed. Technically, it is nearly livable right now.

The septic tank must be dredged (part of the terms of the loan). The skirting must still be installed, and the porches built. Lots of little things on the inside need to be touched up and repaired from the move. We expect it to be about two more weeks before it's all over.

2 comments:

  1. While the yard is all messed up, why not see if the utility company will drop in a spare pole for a nice HF vertical?

    Congrats on the new digs.

    ReplyDelete
  2. Souns like you have the worst of it done.

    I've hooked up septic tanks before
    that is some hard work. But it's better than dealing with a broken one.